Total SA has started-up production from the Edradour & Glenlivet gas and condensate fields, located in about 300 to 435 meters of water in the West of Shetland area (Scotland), close to the Laggan-Tormore fields which came on stream in February 2016.
The Edradour and Glenlivet development will bring additional production capacity of up to 56,000 barrels of oil equivalent a day (boe/d).
The Edradour and Glenlivet development consists of a 35-kilometre tie-back of three subsea wells to the existing Laggan-Tormore production system, which includes the 143-kilometre pipeline and the onshore Shetland Gas Plant. Following treatment at the gas plant, the gas is exported to the UK mainland via the Shetland Island Regional Gas Export System (SIRGE) and FUKA pipeline and will serve the UK domestic market. The condensates are exported via the Sullom Voe terminal.
Total SA has started-up production from the Edradour & Glenlivet gas and condensate fields, located in about 300 to 435 meters of water in the West of Shetland area (Scotland), close to the Laggan-Tormore fields which came on stream in February 2016.
The Edradour and Glenlivet development will bring additional production capacity of up to 56,000 barrels of oil equivalent a day (boe/d).
The Edradour and Glenlivet development consists of a 35-kilometre tie-back of three subsea wells to the existing Laggan-Tormore production system, which includes the 143-kilometre pipeline and the onshore Shetland Gas Plant. Following treatment at the gas plant, the gas is exported to the UK mainland via the Shetland Island Regional Gas Export System (SIRGE) and FUKA pipeline and will serve the UK domestic market. The condensates are exported via the Sullom Voe terminal.
No comments:
Post a Comment