TechnipFMC (FTI) said that jointly with Samsung Engineering and Tecnicas Reunidas, it has been awarded a $4.2 billion contract from Bahrain Petroleum Company (Bapco) for the Bapco Modernization Program (BMP).
The project is located on Bahrain’s Eastern coast and entails the expansion of the capacity of the existing Sitra oil refinery from 267,000 up to 360,000 barrels per day (BPD), improve energy efficiency, valorization of the heavy part of the crude oil barrel (bottom of the barrel), enhancing products slate and meeting environmental compliance.
The project will be executed on engineering, procurement, construction and commissioning (EPCC) lump sum turnkey basis and is slated for completion in 2022. It includes the following main units: residue hydrocracking unit, hydrocracker unit, hydrodesulfurization unit, crude distillation unit, vacuum distillation unit, saturated gas plant, hydrogen production unit, hydrogen recovery unit, sulphur recovery unit, tail gas treatment unit, sour water stripper unit, amine recovery unit, bulk acid gas removal unit, sulphur solidification unit and sulphur handling facilities. Utilities and offsites are also part of the scope.
No comments:
Post a Comment